|
Projects
|  |
|

El Dorado
2006 Updated Resource Estimate
In June 2006, Pacific Rim issued the results of an updated resource estimate for the El Dorado Project. The impetus for the updated resource estimate was primarily to quantify the gold and silver ounces at the South Minita deposit, the subject of an 18-month long definition drilling program at El Dorado that was completed in the spring of 2006. In July 2006 the El Dorado resource estimate was updated again to include inferred resources that were estimated for the Nance Dulce deposit. The Nance Dulce deposit and surrounding area remain open to the discovery of additional mineralization and the Company intends to resume drilling at Nance Dulce in the future. The inferred resource for the Nance Dulce deposit tabulated below should therefore be considered an interim resource estimate. Details of the methodology used in tabulating the 2006 updated El Dorado resource estimate are available at www.sedar.com.
El Dorado Project Resources (as of July 25, 2006)
| Deposit |
Resource Category |
Tonnes |
Gold Grade
(g Au/t) |
Gold Ounces |
Silver Grade
(g Ag/t) |
Silver Ounces |
Gold Equivalent Grade
(g AuEq/t) |
Gold Equivalent Ounces |
| South Minita |
Indicated |
1,070,900 |
9.25 |
318,400 |
63.99 |
2,203,000 |
10.16 |
349,900 |
| | Inferred |
302,800 |
7.20 |
70,100 |
48.23 |
470,000 |
7.89 |
76,800 |
| Minita |
Measured |
614,100 |
12.23 |
241,500 |
80.59 |
1,591,200 |
13.39 |
264,300 |
| | Indicated |
1,175,100 |
9.65 |
364,400 |
58.16 |
2,197,300 |
10.47 |
395,700 |
| | Total M&I |
1,789,200 |
10.53 |
605,900 |
65.86 |
3,788,500 |
11.47 |
660,000 |
| | Inferred |
78,400 |
10.39 |
26,200 |
67.44 |
170,000 |
11.39 |
28,700 |
| |
| Nance Dulce |
Inferred |
128,900 |
19.56 |
81,100 |
121.98 |
506,000 |
21.30 |
88,300 |
| |
| Coyotera |
Measured |
166,000 |
7.86 |
42,100 |
57.79 |
309,000 |
8.69 |
46,500 |
| | Indicated |
501,000 |
7.15 |
115,200 |
58.68 |
945,000 |
7.99 |
128,700 |
| | Total M&I |
667,000 |
7.34 |
157,300 |
58.48 |
1,254,000 |
8.17 |
175,200 |
| | Inferred |
19,000 |
5.83 |
3,600 |
72.12 |
44,000 |
6.86 |
4,200 |
| |
| Nueva Esperanza |
Indicated |
183,000 |
5.77 |
33,900 |
30.47 |
179,000 |
6.20 |
36,400 |
| |
Inferred |
29,000 |
4.67 |
4,300 |
35.49 |
33,000 |
5.17 |
4,800 |
| |
| TOTAL MEASURED & INDICATED ALL DEPOSITS |
3,710,100 |
9.35 |
1,115,500 |
62.24 |
7,424,500 |
10.24 |
1,221,500 |
| TOTAL INFERRED ALL DEPOSITS |
558,100 |
10.33 |
185,300 |
68.16 |
1,223,000 |
11.30 |
202,800 |
Notes:
1) Resources based on a gold equivalent cut-off grade of 4.0 g AuEq/t
2) Gold equivalents based upon a silver to gold ratio of 70:1
3) The Minita resource is INCLUSIVE of reserves defined in the January 2005 El Dorado Pre-feasibility Study
|
A technical report supporting the 2006 El Dorado Project resource estimate was filed on SEDAR on July 31, 2006.
The resources above were estimated by interpreting drill intercepts in cross section, coding samples, capping assays, compositing to vein thicknesses, and estimating grades and thicknesses of each of the veins into a three dimensional grade thickness model. Each of the three veins at the Minita deposit and ten veins at the South Minita deposit were estimated separately. Readers are referred to the Forward-Looking Statements and Other Cautionary Notes and National Instrument 43-101 sections for further disclosure.
|
|